TY  - JOUR
T1  - Pre-posterior optimization of sequence of measurement and intervention actions under structural reliability constraint
JO  - Structural Safety
VL  - 52, Part A
IS  - 
SP  - 1
EP  - 9
PY  - 2015/1//
T2  - 
AU  - Goulet, James-A.
AU  - Kiureghian, Armen Der
AU  - Li, Binbin
SN  - 0167-4730
DO  - http://dx.doi.org/10.1016/j.strusafe.2014.08.001
UR  - http://www.sciencedirect.com/science/article/pii/S0167473014000836
KW  - Pre-posterior
KW  - Reliability
KW  - Measurement
KW  - Optimization
KW  - Uncertainty
KW  - Infrastructure management
ER  - 


